Water impoundment licence
Water impoundment refers to structures within inland waters that can permanently or temporarily change the water level or flow, such as:
- Dams.
- Weirs.
- Fish passes.
- Hydropower turbines.
- Sluices.
- Penstocks.
- Culverts.
- Lock gates.
- Retaining walls.
- Flumes.
- Reservoir embankments.
- Temporary diversions during construction work.
Ref https://www.gov.uk/guidance/water-management-abstract-or-impound-water#impoundment
It is necessary to have an appropriate licence before work begins on a water impoundment structure - even in the case of an emergency. For more information, see Apply for a water abstraction or impoundment licence. There are certain impoundment activities with low environmental risks or other conditions where exemptions to this rule may apply.
The Environment Agency may take enforcement action against those who do not apply before impounding water. Further details are available from Water management: abstract or impound water
[edit] Related articles on Designing Buildings
- Environment Agency.
- Environmental engineering.
- Environmental impact assessment EIA.
- Hydrogeological Impact Appraisal HIA.
- Passive dewatering.
- Raising awareness of dewatering regulation.
- Water abstraction licence.
- Water engineering.
- Water management.
[edit] External resources
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.